Scoped audits.
Traceable evidence.
RP006 lineage sufficiency, RP005A constraints, RP004 representations, RP003 preservation and RP002A prediction, with interpretation limits attached.
RP006 · recorded-attempt-570e92be · COMPLETE
216 truth rows, 48 projections, 120 pair/mask comparisons, 438 conflict rows and 16 certificates passed independent replay. FULL: sufficient masks 001/011/101/111, minimum 001. TOPOLOGY_STATE: sufficient masks 001/010/011/101/110/111, minima 001 and 010. These repeat already disclosed classifications on six known RP004 constructions; Q-3 and Q-4 remain ACTIVE.
RP005A reviewed and completed
24 planner rows, 12 paired comparisons and 35 structural sources independently replayed. Two positive, four zero and six negative outcomes remain preserved: V1 benefits at H=1/2, with no benefit at H=4; V2 and C0 lose coverage. Pure edge removal never expands structural reachability. D-0007 closes the finite RP005A commitment after internal package review. Q-2 stays ACTIVE; Cycle 01 is PUBLISHED. 13 / 13 obligations resolved (100.0%).
RP004 reviewed and completed
864 decoder rows and 60 pair/projection comparisons independently replayed. No wrong answers: 648 correct and 216 UNKNOWN across the four representations. R3 answers all 216 specified inquiries. R0–R2 have explicit same-projection information-loss witnesses. D-0006 closes the scoped RP004 commitment after internal package review. Q-0 and Q-4 remain ACTIVE; Cycle 01 is PUBLISHED; 13 / 13 obligations resolved (100.0%).
RP003 · audit-20261011-001 · COMPLETE
11,100 paths independently replayed. R-RP003001 (VALID) records finite counterexamples and passing positive controls. Local-to-endpoint tolerance fails in 848 of 5,396 eligible paths; local-to-prefix fails in 1,136. No empirical frequency, novelty or general identity conclusion.
Read finite preservation auditRP003 is CLOSED after internal package review under D-0005. Q-0 remains ACTIVE; Cycle 01 is PUBLISHED; 13 / 13 obligations resolved (100.0%). Read the package review.
RP002A · confirmatory-20261010-002 · COMPLETE
60 independent units and 120 learned fits completed. All 484 hashes and saved-checkpoint/analysis replay passed. Two benefit, four equivalent and one indeterminate decision under the frozen .01-nat margins. No trace warning; optimal training is not established.
Result R-RP002A002 (VALID), Test TST-RP002A002. Conditional inference for three finite passive generators, without recurrence necessity, broad Claims or Cycle closure. First-attempt data remain separate.
Read complete benchmarkRP002A · confirmatory-20261009-001 · INCOMPLETE
36/60 complete independent units and 73 saved fit traces. Stopped after a wall-time clock incident; preserved outputs replay without aggregate decisions or a VALID Result for that attempt.
Read interruption and artifact reviewFrozen protocol · Completed calibration · Completed variance assessment
RP002A · pilot-20261008-001
Three worlds, one replicate and at most three epochs. All 49 output hashes match; numerical outputs are finite. No hypothesis, equivalence or novelty decision was made.
Read pilot reviewRP002A · convergence-20261008-001
Twenty independent units, 40 model fits, about 83 seconds. Records and saved-checkpoint replay verified; convergence remains unresolved.
Read convergence-stage reviewRP002A · convergence-20261009-002
Forty fits completed in about 6 minutes 24 seconds. Artifact replay passed. Twelve near-cap warnings remain; optimization is still unresolved.
Read longer-budget reviewRP002A · budget-transfer-20261009-001
Six fits at intended data sizes completed in 5 minutes 48 seconds. All 50 outputs replay; no predeclared warning. One replicate per world supports no variance or inferential conclusion.
Read target-size feasibility reviewInterpretation remains scoped.
The first incomplete attempt remains visible beside the complete benchmark. No broad scientific Claim has been promoted. RP002A is CLOSED after an internal interpretation review. Cycle 01 is PUBLISHED; 13 / 13 obligations resolved (100.0%).
Read package review · Decision D-0004 · Explore planned work