AUTORITE
Document library / Research packages
Review disposition1 min readDownload original .md

Completes synthesis and foundation only; Cycle 02 remains OPEN at 5/9 with all foundational questions unchanged.

Decision D-0019 — Accept Cycle 02 synthesis and foundation reviews

Date: 2026-10-12. Decision: accept the bounded internal Cycle 02 synthesis and foundation assessments.

Accept CYCLE02_SYNTHESIS_REVIEW_001.md and CYCLE02_FOUNDATION_REVIEW_001.md as complete evidence for Cycle 02's synthesis and foundation obligations. The reviews compare all five VALID finite Results without pooling unlike denominators, preserve negative and indeterminate outcomes, and distinguish structural traceability from scientific support.

Resolve only those two obligations. Together with the three previously accepted obligations, Cycle 02 remains OPEN at 5/9. Keep PC01–PC03 FROZEN and PC04–PC06 DRAFT; Q-0/Q-2/Q-3/Q-4 remain ACTIVE and Q-1/Q-5 remain OPEN. No broad Claim, Question resolution, baseline amendment, Cycle 03 transition or additional research run is authorized by these reviews.

Source record

Repository path: docs/decisions/DECISION-0019_CYCLE02_SYNTHESIS_FOUNDATION.md

SHA-256: 9afecfb16cce49ab88154ba2ece4e69fa4f77b60be6eb38f14d1570cd98c3029

This reading view is generated from the source. The downloaded Markdown preserves the original bytes.