Cycle 02 — Forward and backward graph review 001
Review date: 2026-10-12. Scope: the complete declared research graph at source commit fbc76e0209819fa7f24499162349c81db4adf3eb, after D-0017 accepted the RP006 result and before this review's disposition. This is an internal structural review, not external peer review or scientific validation.
Reconstruction
The immutable inventory in CYCLE02_GRAPH_REVIEW_001.json is reconstructed from Git objects and records the SHA-256 of each graph record, the Cycle 02 manifest, all declared relations, typed references, incoming links, forward Question traces, backward Result/Test/package traces and then-resolved Cycle obligations. The checker scripts/check-cycle02-graph-review.py independently reconstructs that exact snapshot and runs current schema/integrity validation. It does not infer transitive support.
The snapshot contains 49 records: 17 Decisions, six Questions, five ResearchPackages, five Results, ten Sources and six Tests. It records 22 declared relations and 124 typed references. Every typed reference and relation resolves to an existing record under the schema checker.
Forward and backward findings
All six foundational Questions are represented. Q-0, Q-2, Q-3 and Q-4 are ACTIVE; Q-1 and Q-5 are OPEN. Q-1 and Q-5 have no linked package, Test or Result in this graph. Q-3 and Q-4 link to RP-006, Test TST-RP006001 and Result R-RP006001; both Questions remain ACTIVE. The graph's declared informs relations are preserved separately from package and Test references.
Five VALID Results have complete backward paths to one Test, its package and its protocol/run/artifact references: RP002A002, RP003001, RP004001, RP005A001 and RP006001. The RP006 path contains the fixed Test and exactly one authorized attempt's manifest and output artifacts. No Result is orphaned or attached to a different package/Test pair. The graph does not promote a Claim or resolve Q-3 or Q-4.
The pre-review Cycle ledger resolves only rp006 and checkpoint-a, each to D-0017. The graph-review, synthesis, foundation, What Changed, What Remains Open, transition and close-bundle obligations remain unresolved. No review artifact itself is treated as evidence of scientific resolution.
Disposition boundary
Accept this reconstruction as completion of only the Cycle 02 graph-review obligation. Keep Cycle 02 OPEN at 3/9 after the separate disposition Decision. Q-3 and Q-4 remain ACTIVE; Q-1 and Q-5 remain OPEN; all Result and package statuses remain unchanged. No experiment, Claim, Question resolution, baseline change, Cycle transition or closure follows from this structural review.
Source record
Repository path: cycles/cycle-02/reviews/CYCLE02_GRAPH_REVIEW_001.md
SHA-256: c28d0daf29bbd7e7c0fce818888c0fceccf89c51f2a1e025e4758e8b977aed74
This reading view is generated from the source. The downloaded Markdown preserves the original bytes.