AUTORITE
Document library / Research working records
Implementation readiness record3 min readDownload original .md

Typed research records, Cycle manifest, evidence and lifecycle checks, test coverage and the remaining experiment gates.

Research record validation — 2026-10-08

Current pipeline disposition — 2026-10-10

The separately authorized second confirmation confirmatory-20261010-002 completed: 60 units, 120 learned fits, 20 replicates per world. All 484 output hashes and data/checkpoint/analysis replay passed. Seven frozen conditional decisions: two benefit, four equivalent, one indeterminate; no predeclared trace warning. Test TST-RP002A002 has audited Result R-RP002A002 (VALID). See research/RP002A/CONFIRMATORY_002_REPORT.md and the preserved timing/host review.

Civil elapsed time was 12297.895 seconds (3h 24m 58s), including lid-triggered host sleep; monotonic elapsed was 6426.015 seconds. Both stayed below the 14400-second allowance. The first attempt remains INCOMPLETE and unchanged. No samples/checkpoints or primary results were pooled; no further run is authorized. These decisions concern the fixed algorithms and generator settings under independence/normal-theory assumptions and fixture-specific .01-nat margins. No recurrence necessity, broad Claim or Cycle closure follows. RP002A and Cycle 01 remain ACTIVE; 0/13 obligations resolved.

Run locally

python3 -m pip install -r scripts/requirements-sites.txt
python3 scripts/check-baseline.py
python3 packages/research-schema/validate.py
python3 -m unittest discover -s tests
python3 scripts/build-sites.py
python3 scripts/check-sites.py

Remaining execution gates

Structural validation is implemented; the audited bootstrap and baseline freeze were approved. RP002A has a numerical configuration proposal, but its collision assessment, power/effect rationale, full collision/power review, approved reproducibility environment and pre-outcome freeze are incomplete. No experiment is run by a validator or a passing CI job.

Executable RP002A preparation

The generator, reference, model and pilot harness now have engineering acceptance checks; the complete suite has 30 tests. The separate pilot proposal and execution gates are documented in research/RP002A/EXECUTION_READINESS.md. No research run has occurred.

First exploratory pilot

research/RP002A/PILOT_001_REPORT.md records the completed isolated engineering pilot and raw artifacts. No scientific Claim or Cycle obligation was resolved. Further runs require a separate reviewed plan; confirmatory preparation remains open.

Convergence-stage disposition — 2026-10-09

research/RP002A/CONVERGENCE_001_REPORT.md documents the separately approved 20-unit exploratory stage. All 40 fits completed and artifact/checkpoint replay passed; many fits still improved near the 50-epoch cap. Settled optimization and confirmatory readiness are not established. No additional run or scientific Claim promotion is authorized.

Longer-budget disposition — 2026-10-09

research/RP002A/CONVERGENCE_002_REPORT.md records the separately approved fresh-seed stage: 40 fits completed in 383.749 seconds and 322 outputs replay successfully. Twelve near-cap warnings remain despite no late-improvement flags; settled optimization is not established. No further execution or confirmatory Claim promotion is authorized.

Target-size feasibility disposition — 2026-10-09

The separately approved pilot budget-transfer-20261009-001 completed once: three units, six fits, 348.175 seconds, about 251.42 MiB lifetime peak process resident memory. No predeclared warning was triggered; this is not convergence proof. One training replicate per world supplies no variance or inferential conclusion. The full review is research/RP002A/BUDGET_TRANSFER_REPORT.md. Prior warnings remain on record; confirmation is PLANNED and Cycle 01 remains 0/13. No further execution is authorized.

Uncertainty design follow-up — 2026-10-09

research/RP002A/UNCERTAINTY_DESIGN_REVIEW.md audits the current nested resampling variance and extreme-tail bootstrap resolution, with deterministic precision/resource sensitivity. Target-size variance, analysis coverage and substantive margins remain open. No final sample count or interval is chosen; no new training, Claim or Cycle resolution. The historical numerical proposal remains unchanged.

Source record

Repository path: docs/research/VALIDATION_READINESS.md

SHA-256: a102bb57671d59cbfeceaf5ee8d384467dc81bb1c1f144b5bcc4a47ab3af6948

This reading view is generated from the source. The downloaded Markdown preserves the original bytes.