AUTORITE
Document library / Research packages
Transition decision1 min readDownload original .md

Selects preparation of a finite lineage challenge; Cycle 02 stays OPEN at 8/9, with no Cycle 03 entry or execution.

Decision D-0021 — Accept Cycle 02 transition review

Date: 2026-10-12. Decision: accept the bounded Transition Record and select preparation of a new finite lineage-construction challenge as the next research direction.

Resolve only Cycle 02's transition obligation. Cycle 02 remains OPEN at 8/9; the close bundle and canonical knowledge snapshot remain open. The selected direction tests whether the registered RP006 whole-field mask classifications transfer to a new, separately specified finite corpus with varied state payloads and more than three entities, using the existing query families unless a later reviewed scope decision changes them.

This is not a Cycle 03 entry, package/Test registration, resource allocation, source freeze or research authorization. A separate entry review must satisfy the prior-art, protocol, independent-truth, implementation, resource and actual pre-execution gates. No Question, Result, package, baseline or foundation status changes.

Source record

Repository path: docs/decisions/DECISION-0021_CYCLE02_TRANSITION.md

SHA-256: d47cd218f488e15a49ef11d6abd267b4a817f627e380884b509cb1b5bc51e881

This reading view is generated from the source. The downloaded Markdown preserves the original bytes.